ABB AC900F學習筆記62:Freelance_Mounting_and_Installation_AC_900F_Controller-22
阿新 • • 發佈:2021-08-17
繼續學習,開始進入安裝章節
5 Mounting 安裝 This section provides information on initial mounting and removal of the modulesand accessories of an AC 900F controller. These operations must be performedwhile all components are de-energized。本節提供有關模組和AC 900F控制器附件的初始安裝和拆除的資訊。當所有的模組斷電時,必須執行這些操作。
Prior to performing any mounting or demounting operations, switch off thecontroller and associated devices and secure the equipment against unintentionalstart-up.
在執行任何安裝或解除安裝操作之前,請關閉控制器和相關裝置,並保護裝置免受無意啟動。 |
Observe appropriate distances to adjacent devices (see dimensional drawings) toensure sufficient cooling of the equipment.
觀察與相鄰裝置,保持適當距離(參見尺寸圖紙),確保裝置散熱。 |
將PM CPU模組扣到DIN導軌上。為此目的,模組必須是放置在導軌頂部並向下推,直到它鎖定到位。